Alright, drawing on further experience how and where to unload I managed to spread out a yard and a half of topsoil today and...
Alright, drawing on further experience how and where to unload I managed to spread out a yard and a half of topsoil today and don’t feel half wiped. Key is figuring how to use torso twisting. To build up specific areas along the fence I’ve had an interim “transfer to garden cart” step, with this done and spillage along the way building up Strawberry Ridge I’ll be able to back up and just pitch it directly out of the bed to where it’s going (and then next load back up onto that and compress it with Darwin’s weight).
Could get up to 6 yards a day that way, which is nice because it’s been somewhere between 3.5 and 5 yards since I said there were a minimum of 6 left and there are now a minimum of 10 left.