{"version": "1.0", "type": "rich", "title": "Smashing shoulder's back and I finished off 1 of the 2 parts of Blueberry Hill remaining. (In the \"dugout\", where the soil level...", "author_name": "kontextmaschine", "author_url": "https://kontextmaschine.com", "provider_name": "kontextmaschine", "provider_url": "https://kontextmaschine.com", "url": "https://kontextmaschine.com/post/714817037976961024/", "html": "<p>Smashing shoulder&rsquo;s back and I finished off 1 of the 2 parts of Blueberry Hill remaining. (In the &ldquo;dugout&rdquo;, where the soil level inside the shell of Blueberry Hill is below where I built the sides to)</p><p>Then started to fill it in with logs, then I&rsquo;ll cover with twigs, smash, then grass clippings. The other area is more out of the way against a slope, but as is pine branches shade it from rain while it&rsquo;ll smash into a drainage path, so I want to do that to get it wet some before the rainy season ends.</p><p>Also, dug some drainage ditches alongside the path with my ditch shovel.</p>"}