Smashing shoulder's back and I finished off 1 of the 2 parts of Blueberry Hill remaining. (In the "dugout", where the soil level...
Smashing shoulder’s back and I finished off 1 of the 2 parts of Blueberry Hill remaining. (In the “dugout”, where the soil level inside the shell of Blueberry Hill is below where I built the sides to)
Then started to fill it in with logs, then I’ll cover with twigs, smash, then grass clippings. The other area is more out of the way against a slope, but as is pine branches shade it from rain while it’ll smash into a drainage path, so I want to do that to get it wet some before the rainy season ends.
Also, dug some drainage ditches alongside the path with my ditch shovel.