{"version": "1.0", "type": "rich", "title": "Waiting on that pole saw and a plain handsaw (the old one got dulled, rusted, gummed), need 2-3 days more (incl. dirt drying &...", "author_name": "kontextmaschine", "author_url": "https://kontextmaschine.com", "provider_name": "kontextmaschine", "provider_url": "https://kontextmaschine.com", "url": "https://kontextmaschine.com/post/695770434792210432/", "html": "<p>Waiting on that pole saw and a plain handsaw (the old one got dulled, rusted, gummed), need 2-3 days more (incl. dirt drying &amp; crumbling cycles) of hose work on the one bamboo stand, all that&rsquo;s left to do now is cultivator-mattock pickaxing the other one, assembling the woodrack, or mud-mortaring another course of stones onto the Blueberry Hill retaining wall, which was the one yard action item I could think of last <i>December</i></p><p>When it starts raining again I&rsquo;ll have cause to do weeding rounds and tamp mud into my dirt ramp again, and blow falling leaves onto the Strawberry Hill piles</p>"}